The material flow planning and the system layout help optimize and visualize space consumption, minimize throughput times and point out efficient flows of material.
If everything has been clarified and completed successfully, the concept is discussed in detail with the architect and the people in charge of construction, building technology and fire prevention.
In this phase of the project
are established. Then, the invitation to tender follows as last step of the planning phase. Here as well, Klinkhammer offers a wide range of competences and detailed industry expertise – so that visions turn into reality.